Skip to content

Sidekick Agent Hub

See what your AI coding agents are doing, and what they cost. Live monitoring for Claude Code, Codex and OpenCode, in VS Code and the terminal.

The Sidekick terminal dashboard following a live agent session

Open VSX Open VSX Downloads VS Code Marketplace VS Code Installs npm npm Downloads License: MIT

Sidekick reads the session files your agent already writes. There is no proxy and no wrapper: you keep running claude, codex or opencode the way you do now, and Sidekick follows along in the editor sidebar or a second terminal.

What Sidekick Does For You

What it's doing

The Activity Map draws every tool call as it happens: the files the agent reads and edits, the shell commands it runs, the network calls it makes, the subagents it spawns. Afterwards it shows where the session's time, errors and context went, and any past session can be replayed. The session timeline, mind map and event stream show the same session as a list, a graph and a live feed.

sidekick map --follow drawing a live session

What it costs

Tokens (cache included), estimated cost per model, how full the context window is, and how much of your plan's quota is left: the five-hour and weekly limits for Claude, the rate-limit windows for Codex. The current five-hour billing block shows its burn rate and where it will end up. Daily, weekly and monthly usage reports are computed from the session logs, so they also cover sessions from before you installed Sidekick, as long as the logs are still on disk.

Session tab: context window and 5-Hour / 7-Day quota gauges

What to keep

When a session ends, what it learned usually goes with it. Sidekick keeps tasks, decisions, knowledge notes and plans per project, and can write a handoff document so the next session starts where this one stopped instead of from zero. The extension and the CLI share the same stores.

Kanban Board: the session's tasks by status

Also

  • Account switching. Keep several Claude Code and Codex logins and switch between them without /logout, from the VS Code Accounts view or sidekick accounts. Every switch is verified and can be undone.
  • A facts server for your agent. sidekick mcp is a read-only MCP server the agent can query for its own quota, burn rate, context pressure, activity map, tasks, decisions and notes.
  • AI features, when you want them. In VS Code, Sidekick can also write commit messages, transform selected code, explain code and errors, review your changes, and complete code on demand. These run through your Claude subscription, the Claude API, OpenCode or Codex CLI.

Install

VS Code extension

Install Sidekick Agent Hub from the VS Code Marketplace or Open VSX (Cursor, VSCodium and other forks). Click the Agent Hub icon in the activity bar: Sidekick detects which agent you use and attaches to its most recent session. See Installation and the Quick Start.

Terminal

Note: The npm package is sidekick-agent-hub, but the binary is called sidekick.

npm install -g sidekick-agent-hub
sidekick dashboard

Requires Node.js 20+, or 22.15+ to read the compressed sessions (.jsonl.zst) Codex writes for older rollouts. The CLI works standalone, with any editor or none. Run it in a second terminal or a tmux pane beside your agent, or run sidekick map --follow there for the live activity map. See CLI Dashboard for the full guide.

Shared library

Building your own tool on top of Sidekick session data? The sidekick-shared npm package provides types, parsers, session providers, event aggregation, model pricing, Zod schemas, actionable session-asset extraction, and more — no VS Code or CLI dependency required.

npm install sidekick-shared

See the Architecture Overview for what's included.

Feature Highlights

VS Code: Session Analytics, Activity Map, History and Accounts

VS Code and CLI

Available in the VS Code extension and the CLI dashboard. The CLI works standalone — no VS Code extension required.

  • Session Monitor — tokens (cache included), cost per model, context fill, burn rate, compactions, and the session timeline, live. See Session Monitor
  • Activity Map — every tool call pulses out to one of eleven stations (files, shell, network, memory, agents, …) and back, live or replayed: a sidebar view and editor tab in VS Code, and sidekick map in the terminal (--follow for a live full-screen map, or text, SVG and JSON exports at any moment with --at). See Activity Map
  • Quota — Claude's five-hour and weekly limits, plus extra meters such as a weekly Fable cap; Codex rate-limit windows; z.ai Coding Plan quota for OpenCode. Threshold alerts fire once per reset window, and sidekick quota / sidekick quota history check it from the shell
  • Usage Reports & Billing Blocks — sidekick daily, weekly, monthly and sessions compute usage straight from session logs; five-hour billing blocks (sidekick blocks, and a card in both dashboards) show the burn rate and end-of-block projections
  • Account Switcher — keep several Claude Code and Codex logins and switch between them with a verified, undoable switch: the Accounts view and Ctrl+K Ctrl+Shift+A in VS Code, sidekick accounts and the A overlay in the terminal dashboard. Run two accounts side by side and see credential health before it fails; VS Code can also switch automatically at a quota threshold. See Account Switcher and the Account Management API
  • Mind Map — trace how your agent navigated the codebase, with cycling file and goal-gate indicators
  • Kanban Board — track tasks and subagents at a glance, with goal-gate badges on critical tasks
  • Plans — the plan your agent is working through, step by step, and the plans of earlier sessions. See Plans
  • Knowledge Notes — capture gotchas, patterns, guidelines, and tips attached to files, with lifecycle tracking
  • Decision Log & Session Handoff — decisions extracted from sessions, and handoff documents so the next session picks up where you left off
  • Provider Status — live API health scoped to the monitored provider: Claude for Claude Code sessions, OpenAI for Codex sessions, hidden for OpenCode; sidekick status checks both
  • HTML Session Report — self-contained HTML report with full transcript, token/cost stats, the activity map, and tool-use breakdown
  • Session Asset Extraction — pull URLs, file paths, commands, and plans out of recent Claude Code and Codex chats (Sidekick: Extract Session Assets or sidekick extract)

VS Code only

  • Session Analytics tabs — Summary (metrics plus an optional AI narrative), History (usage over time, by model, tool or project), and Health (the doctor checks in place)
  • Project Timeline — chronological view of the project's sessions with duration, token usage, and expandable details. See Project Timeline
  • Context Health — track how much information your agent has lost to context compaction
  • Truncation Detection — know when tool outputs are silently cut short
  • Cycle Detection — get alerted when your agent enters repetitive loops
  • Peak Hours Indicator — subtle orange pill + status-bar glyph when Claude is in a peak window (faster session-limit drain); only appears on Claude Max subscriptions (sidekick peak checks from the terminal). See Peak Hours
  • Accessibility — prefers-reduced-motion support, keyboard navigation, ARIA landmarks, and focus-visible indicators across all panels

The full list of commands and default keybindings is in the VS Code Command Reference.

CLI only

  • MCP Facts Server — sidekick mcp serves read-only quota, burn-rate, context, activity-map, task, decision, and note facts over MCP stdio, for Claude Code or Codex to query. See MCP Facts Server
  • Status Line — sidekick statusline puts the account, quota windows, context, session cost, and cache hit rate in Claude Code's status line, and records Claude's official rate limits for every other surface. Sidekick: Install Statusline sets it up from VS Code. A public, versioned state.json feeds tmux bars and scripts. See Daily brief and diagnostics
  • One-shot commands — sidekick today, doctor, search, history, dump, report, and quick capture with tasks add, note add, and decision add. See the Command Reference

AI features (VS Code)

  • Inline Completions — on demand with Ctrl+K Ctrl+Shift+Space, using your project context
  • Code Transforms — select code, describe changes in natural language
  • AI Commit Messages — messages generated from your actual diff
  • Quick Ask — inline chat for questions and code changes without switching context
  • Code Review — catch bugs and security concerns before they reach your team
  • PR Descriptions — structured summaries from branch diff, ready to paste
  • Error Analysis — understand what went wrong, why, and how to fix it, with color-coded explanation sections and one-click Apply Fix
  • CLAUDE.md Suggestions — learn from session patterns to improve agent effectiveness

Supported Agents and Providers

Agent Monitoring Account switching Quota
Claude Code ✅ ✅ Five-hour and weekly limits (Ultra has no five-hour window)
Codex CLI ✅ ✅ Primary and secondary rate-limit windows
OpenCode ✅ ❌ z.ai Coding Plan quota when OpenCode is routed through z.ai

The AI features use a separate inference provider, chosen independently of the agent you monitor:

Inference provider Cost
Claude Max Included in subscription
Claude API Per-token billing
OpenCode Depends on configured provider
Codex CLI ChatGPT plan or API billing

See Provider Setup.

Why Am I Building This?

AI coding agents are the most transformative tools I've used in my career. They can scaffold entire features, debug problems across files, and handle the mechanical parts of software engineering that used to eat hours of every day.

But they're also opaque. Tokens burn in the background with no visibility. Context fills up silently until your agent starts forgetting things. And when a session ends, everything it learned — your architecture, your conventions, the decisions you made together — is just gone. The next session starts from zero.

That bothers me. I want to see what my agent is doing. I want to review every tool call, understand where my tokens went, and carry context forward instead of losing it. Sidekick exists because I think the people using these agents deserve visibility into how they work — not just the output, but the process.

See Also

Sidekick Docker — a sibling project that brings the same real-time dashboard experience to Docker management. Monitor containers, Compose projects, images, volumes, and networks from a keyboard-driven TUI or VS Code panel. Available as a VS Code extension, Open VSX extension, and CLI.

Contributing

Contributions welcome! See the Contributing Guide.

Community

If Sidekick is useful to you, a star on GitHub helps others find it.

Found a bug or have a feature idea? Open an issue — all feedback is welcome.

License

MIT